new-term-radar
Daily radar for new AI terms: names of new models, products and repos, caught on X, Hugging Face, GitHub and sitemaps before keyword tools list them.
翻譯準備中
一個按排名、信心水平分類的馬薩諸塞州商業與工業場址清單,列出250 kW / 522 kWh 電池在月度帳單需求中佔有顯著份額的場所。
AI 翻譯
A ranked, confidence-tiered list of Massachusetts commercial and industrial sites where a 250 kW / 522 kWh battery captures a meaningful share of the monthly billing demand.
行銷Python · JavaScriptGitHub @Prashanthvara上線中營運者未確認
試用過了嗎? 點一下就好,不需要登入。
尚未偵測到更新。GitHub 發布版本後會顯示在這裡。
個人 GitHub 帳號下公開儲存庫的擁有者可以登入並驗證所有權,自行管理介紹,無需管理員核准。
登入並產生驗證檔案,在 30 分鐘內將其提交至此儲存庫的預設分支。其他分支或分叉儲存庫中的檔案無效。然後在下方檢查檔案,即可無需管理員核准直接管理專案。請保留檔案以維持管理權限。
如需登入,將前往登入頁面。登入後請回到此處,再次點擊所選的驗證按鈕。
在專案資料夾中執行 /nomorevibe verify,即可驗證所有權並自行管理介紹。
一分鐘完成驗證根據公開評估師資料與國家電網收費檔案,將馬薩諸塞州 C&I 建築依每月計費需求排名,評估 250 kW / 522 kWh 電池可吸收的需求量。
AI 翻譯
Ranks Massachusetts C&I buildings by how much monthly billed demand a 250 kW / 522 kWh battery could absorb, from public assessor data and the filed National Grid tariff.
取自儲存庫 README
正在載入完整 README。 以下為已儲存的摘錄。
Ranks commercial and industrial buildings in Worcester, Fall River and Lowell
by how much of their monthly billed electrical demand a 250 kW / 522 kWh
battery could actually absorb, and what that saves at the filed tariff rate.
All three are National Grid (Massachusetts Electric) territory, which the
G-2/G-3 tariff requires. data/town_utilities.csv is the checkable record.
4,179 parcels screened, 1,450 with enough demand charge to be worth a call.
It scores sites before anyone picks up the phone. The industry sequence is
talk, then ask for a utility bill, then decide. This inverts that.檢視完整 README ↗目前無法載入完整 README。請透過原文連結閱讀。 以下為已儲存的摘錄。
Ranks commercial and industrial buildings in Worcester, Fall River and Lowell
by how much of their monthly billed electrical demand a 250 kW / 522 kWh
battery could actually absorb, and what that saves at the filed tariff rate.
All three are National Grid (Massachusetts Electric) territory, which the
G-2/G-3 tariff requires. data/town_utilities.csv is the checkable record.
4,179 parcels screened, 1,450 with enough demand charge to be worth a call.
It scores sites before anyone picks up the phone. The industry sequence is
talk, then ask for a utility bill, then decide. This inverts that.檢視完整 README ↗