Lalabase
Tickets, Doku, Zeiterfassung und Kundengespräche an einem Ort, durchsuchbar per KI. Für Softwarefirmen mit Kundenprojekten. Open Source: auf deinem eigenen Server oder in unserer Cloud in Deutschland.
Translation pending
Photo, scope, price, customer signature. 60 seconds from the job site. Stop losing thousands on undocumented change orders.
BusinessTypeScript · HTMLGitHub @wouldjaballOnlineOwner unconfirmed
Have you tried it? One tap is enough. No sign-in needed.
No updates detected yet. GitHub releases will appear here.
Owners of public repositories under a personal GitHub account can sign in to verify ownership and manage the introduction themselves. No administrator approval is needed.
Sign in, generate a verification file, and commit it to this repository’s default branch within 30 minutes. Files on other branches or forks do not count. Then check the file below to manage the project without administrator approval. Keep the file to retain your access.
If needed, you will go to sign-in. After signing in, return here and press your chosen verification button again.
Run /nomorevibe verify in your project folder to verify ownership and manage the introduction yourself.
Verify in one minuteAsk about other verification options
The maker's introduction consists of the line above. Read the repository README for more details. Repository README ↗
Loading the full README.
Read the full README ↗This is a Next.js project bootstrapped with create-next-app.
First, run the development server:
npm run dev
# or
yarn dev
# or
pnpm dev
# or
bun dev
Open http://localhost:3000 with your browser to see the result.
You can start editing the page by modifying app/page.tsx. The page auto-updates as you edit the file.
This project uses next/font to automatically optimize and load Geist, a new font family for Vercel.
To learn more about Next.js, take a look at the following resources:
You can check out the Next.js GitHub repository - your feedback and contributions are welcome!
The easiest way to deploy your Next.js app is to use the Vercel Platform from the creators of Next.js.
Check out our Next.js deployment documentation for more details.